HOW TO PREPARE
Get Recycle Ready by preparing the plumbing in your building
Whether you are planning a new build or a retrofit in an existing building – before our Hydraloop Partners can install a decentral water recycling system at your location, we need to make sure the pipes are laid out in the right way.
Preparing the plumbing is not difficult. In this document, you’ll find the information to get any building Recycle Ready.

Before and after treatment

CONNECTION OVERVIEW
Input: Greywater from​
​
-
Shower and bath
-
Drying machine
-
Air conditioning or heat pump
-
Optional: washing machine
​
System connections:
​
-
WiFi connection
-
Power supply
-
Backup water (tap or rainwater)
​
Output: Dedicated pipelines for
​
-
Toilet flushing
-
Washing machine
-
Garden irrigation
-
Swimming pool
-
Sewage outlet

PREPARE FOR HYDRALOOP CASCADE
Hydraloop Cascade
With a Hydraloop Cascade, the lay-out of the piping network of the building(s) takes preparation. We offer scalable made-to-measure solutions for projects of any size. Please send us drawings and additional information about your building(s), so we can provide you with a plumbing proposal with the best solution for your project.
REDUCES TOTAL INTERNAL WATER CONSUMPTION BY UP TO 45%


PLUG AND.PLAY
Installing and commissioning a Hydraloop unit is comparable with connecting a washing machine. First, the plumbing is prepared, then your Hydraloop installer places the unit and fits the connections for water, wastewater and internet. Then, the unit is switched on and tested by the installer. The central Hydraloop server does a quick scan to check the system performance and connections. After that, the installation is finished, and the system will begin its start-up procedure.
If your building is Recycle Ready according to our indications, the installation and commissioning process will take no longer than ±1,5 hours.
MAINTENANCE
All units are self-cleaning, so they don’t need regular cleaning or servicing. The online Hydraloop central server monitors the performance of each unit 24/7 and all Hydraloop unit components are checked internally.
In the unlikely case of a malfunction, your Hydraloop unit will automatically adapt to the situation. If, for example, the UV disinfection lamp should fail, the unit will automatically switch to backup water. The smartphone app will you send a notification and notify your Hydraloop installer by email.
We recommend an overall preventive maintenance check by your Hydraloop installer once every 2 years.


Hydraloop water quality is independently tested and
certified by:
​​
NSF: The NSF/ANSI 350 standard verifies that all design and performance requirements of the standard have been met and confirms through 26-week testing that effluent reuse water meets the stringent quality criteria for designated uses.
PIA: PIA is an internationally accredited and notified testing body in Germany for the certification of wastewater treatment products and has granted Hydraloop its certificate.
KIWA: This world leader in Testing, Inspection, and Certification (TIC) granted Hydraloop its safety certificate.
​
​
This document states that the Hydraloop H300 system complies with the FCC standard.
​
This Belgaqua certificate approves all Hydraloop models according to the EN 1717 norm. EN 1717 deals with the protection of potable water supplies from pollution caused by back-flow.
Hydraloop has been awarded the Swiss quality label ‘Efficient Solution’ by the World Alliance for Efficient Solutions.
​
The cUPC® mark demonstrates compliance to the Uniform Plumbing Code®, the only plumbing code named an American National Standard and the basis of plumbing codes that protect more than one half of the world’s population.
​​
​
Hydraloop products are guaranteed high-quality products, assembled by our production partner Technologies Added, an ISO certified smart production factory based in the Netherlands.